Questions we get asked about IPSYS Analytics. Answered. (Part 1 of 2)
"Does it work on P6 XER files directly?"
Yes. Upload your XER and the analysis starts immediately.
"Does it score against DCMA 14-point?"
Yes — and it goes well beyond that.
Here's what IPSYS Analytics actually does:
Step 1 — WBS & Contractor Narrative Analysis
PMI and AACE-based WBS quality scoring. Structure, hierarchy, primacy — evaluated before you touch a single activity. IPSYS extracts text directly from the contractor narrative and generates actionable contractor delay statements — carried progressively through every step of the analysis.
Step 2 — DCMA 14-Point Health Check
Full scoring with explanations. Trending across submissions so you can see if the schedule is getting better or worse. And if you're not sure what a metric means — Ask IPSYS. It tells you exactly what it means and why it matters.
Step 3 — Schedule Comparison & Progress Analysis
What changed between submissions. Look-ahead analysis. What moved, what didn't, and why it matters. Group changes by activity within the WBS structure or by change category — you control how you see the story. With Ask IPSYS, a user can ask directly: "Which critical activities should I be focused on for the next update period?" — and get a targeted, data-driven answer. Reviewers can also document potential delays in accordance with AACE 29R standards — turning observations into defensible, professionally grounded delay positions.
Step 4 — Longest Path & Progressive Float Analysis
Driving path identification with natural language path summarization. Near-critical path visibility. And with Ask IPSYS, you can interrogate the details of each longest path analysis directly — not just read the results, but understand what's actually driving them.
More in Part 2.
IPSYS Analytics automates WBS analysis as Step 1 of our 8-step Smart Schedule Wizard. Request early access to see how it works with your project data.